
The 9,500 m² prefabricated construction site complex was completed in a short time with high coordination and a fast production process. The project includes administrative offices, dormitories, dining halls, local buildings, and infirmary units designed to meet various needs of the teams working on the road construction.
Designed to withstand challenging field conditions, the buildings stand out with their durable steel structural systems, high insulation performance, and modular installation features. With its fast assembly and long-lasting use, the project once again proved the efficiency of prefabricated construction site solutions on an international scale.