
The Mersin Camp Buildings Construction Site Project, covering a total area of 6,500 m², was completed and delivered in just 130 days. Within the project scope, durable, quickly assembled, and functional buildings suitable for camp site requirements were built using prefabricated and light steel hangar systems.
Designed with high engineering standards, this project once again demonstrated our capability to respond to client needs rapidly and effectively. With fast production and assembly processes, we continue to deliver reliable and sustainable construction site camp solutions.