The 3rd Airport Waste Facility Office and Rest Building, with a total enclosed area of 1,530 m², was successfully completed through meticulous processes from production to assembly. The project strongly demonstrates the advantages of prefabricated building systems in industrial facilities, such as speed, durability, and functionality.
With its short installation period and high engineering quality, the structure increases worker comfort while enhancing operational efficiency. This project stands as a successful example proving the effectiveness of prefabricated solutions in large-scale infrastructure and industrial investments.