Project Details
Location 1: Bursa | Yenişehir Dimensions: 1,500 m² | 15 m × 100 m Clear Span: 15 m Bay Spacing: 7 m
Location 2: Bursa | Karacabey Dimensions: 500 m² | 15 m × 33 m Clear Span: 15 m Bay Spacing: 3 m
With a total enclosed area of 2,000 m², the Road Construction Site Warehouse Building Project was planned and completed simultaneously at different sites. Both buildings were designed with the fast installation, long service life and wide-span advantages of light steel systems.
As in every project, Dem Steel continues to make a difference in this work with innovative engineering solutions, high quality standards and reliable production processes.
The right solution begins with clearly defining where and for what purpose the building will be used. The number of users, period of use, climate conditions, site access and utility connections all affect project decisions. In prefabricated systems, clarifying this information at an early stage allows the production and installation schedule to be prepared more soundly.
Controlled production in the factory allows the dimensions and details of the building components to be prepared according to the project data. Installing the parts that arrive on site in a pre-planned assembly sequence simplifies labour organisation and helps reduce unnecessary material waste during the application process.
Details such as insulation, doors and windows, interior partitions, electrical and plumbing installations are determined according to the purpose of use. A temporary site building and a corporate building used for many years do not require the same technical scope. A technical specification tailored to needs therefore gives better results than a standard package.
Get a Quote and Information
Share your purpose of use, approximate floor area and application location. The Demonte Prefabrik team will assess the right scope for your project with you.