Project Details
Demonte Prefabrik produced a comprehensive camp settlement for site needs in Çatalca, Istanbul. The project included a 114 m² engineers’ dining hall, a 181 m² guest dormitory, a 102 m² engineers’ lounge, a 902 m² engineers’ dormitory, a 716 m² administrative office building and a 289 m² workers’ dining hall. A total of 600 m² of light steel hangar structures was also produced and included in the project. All buildings combine fast installation, durability and functionality, creating a modern and efficient usable area on site.
The load-bearing system is shaped by engineering calculations according to span, height, purpose of use, climate loads and site conditions. The clear interior volume and entrance openings required differ between operations such as storage, production, maintenance or agricultural use. The building geometry should therefore be planned around the actual operational flow, not just a floor area target.
Roof and façade cladding, insulation needs and natural lighting options directly affect how the building performs in use. For long-term use, maintenance access, rainwater drainage, ventilation and, where necessary, additional doors or openings should also be considered at the initial design stage.
One of the key advantages of steel structures is that production and on-site installation can be carried out in a planned sequence. Clarifying manufacturing details before the project reduces cutting and correction work on site. Resolving connection details correctly contributes not only to installation speed but also to safe use throughout the building’s service life.
Get a Quote and Information
If you are planning a building similar to this project, let us know your purpose of use and approximate floor area.